Home Value Trail

What a building permit counts

The permit figures count homes that a local office allowed to be built. They do not count homes that are built.

The Census Bureau describes the purpose of the Building Permits Survey in these words:

The purpose of the Building Permits Survey is to provide national, state, and local statistics on the number and valuation of new privately-owned housing units authorized by building permits in the United States.

This site shows the counts through September 2026.

A permit and a unit

A permit is an approval. The Census Bureau counts the housing units that the permits allow. It defines them:

A housing unit, as defined for purposes of these data, is a house, an apartment, a group of rooms, or a single room intended for occupancy as separate living quarters.

A permit for an apartment building with 120 flats counts 120 units. A permit for one house counts 1 unit. The site says "housing units authorized" for this reason.

The size of a building

The Census Bureau counts units by the size of the building. The site shows four sizes: 1 unit, 2 units, 3 or 4 units, and 5 or more units.

The Census Bureau says: The one-unit structure category is a single-family home. A building with 1 unit can be detached or attached.

The permit office

A local office issues the permits. It can be a city, a town, a township or a county. The Census Bureau names the office a permit-issuing place:

A geographic area that issues building or zoning permits for the construction of residential structures.

An office does not always match the border of a city. Some offices cover a part of a city. Some cover more. The city pages of this site are pages of permit offices.

The Census Bureau says that not all areas require a permit:

The approval given by a local jurisdiction to proceed on a construction project. Note that not all areas of the country require a permit for construction.

Reported figures and estimates

Some offices do not send a report. The Census Bureau then uses another source or it imputes the figure. That means it makes an estimate. It says:

Data labeled as "Estimates with Imputation" include the imputed data as well as reported data from the respondent or from the SOC.

The counts on this site include these estimates. A count for a small place can be partly an estimate.

Revisions

The Census Bureau does not revise the monthly figure of a place after its first release. It says:

The monthly estimates by Census Division, state, metropolitan area, county, and permit-issuing place are not revised after their initial release.

It publishes final annual figures one time each year. The annual files of this site use these figures.

Permits, starts and completions

A permit is the first of five steps of a residential construction project. The Census Bureau lists them:

The category of statistics called "New Residential Construction" consists of data on the five phases of a residential construction project: (1) housing units authorized to be built by a building or zoning permit; (2) housing units authorized to be built, but not yet started; (3) housing units started; (4) housing units under construction; and (5) housing units completed.

This site shows the first phase only. A permit does not show that the work started or ended.

What the counts leave out

The Census Bureau says that the statistics exclude some kinds of housing:

New residential construction statistics exclude group quarters (such as dormitories and rooming houses), transient accommodations (such as transient hotels, motels, and tourist courts), "HUD-code" manufactured (mobile) homes, moved or relocated buildings, and housing units created in an existing residential or nonresidential structure.

Units for each 1,000 residents

A large county has more permits than a small county. To compare them, the site divides the units of the latest 12 months by the residents of the area. It multiplies the result by 1,000.

The Census Bureau gives the population estimates that the site uses. A permit office that is not a Census place has no estimate.

The page of the Census Bureau for the survey is Building Permits Survey.

Follow one city count

Lakewood, OH has 187 housing units authorized in the 12 months to September 2026.

Housing units authorized in the two consecutive 12-month periods
PeriodUnits
12 months to September 2026187
12 months before1

These are housing units, not the number of buildings or completed homes. One building can contain several units.

The price trail on this city page is the FHFA index for Cuyahoga County, ending in 2025. It is a separate measure.

Last checked against the agency pages: